Skip to content
Global project buyers · Qingdao, Chinainfo@tzstainless.com

QUALITY & CUSTOMISATION PROCESS

Specifications, drawings & inspection

Custom stainless projects succeed when dimensions, structure, operating details and inspection points are clear before production starts.

A practical specification and inspection process.

We do not treat a reference photo as the final instruction. The project is translated into a confirmed specification covering dimensions, material, working height, storage layout, door or drawer movement, shelves, feet or castors, surface expectations and packing. This reduces avoidable changes later.

01

01 · Requirement review

Confirm the product use, available space, cleaning routine, quantity, known dimensions and destination.

02

02 · Detail confirmation

Align dimensions, material, thickness, storage layout, accessories and any door or drawer movement.

03

03 · Production checks

Review dimensions, assembly, door or drawer movement, shelf fit, finish and agreed accessories.

04

04 · Packing confirmation

Protect exposed surfaces and confirm project packing and shipment details before dispatch.

Specification details

The final quotation records the agreed material, dimensions, configuration, accessories, finish expectations, packing and commercial terms.

DimensionsChecked against the approved specification or drawing
MaterialConfirmed in the quotation; 304 stainless is the standard project focus
Doors and drawersOpening direction, clearances, alignment and hardware where applicable
AccessoriesShelf, drawer, handle, foot or castor configuration
Finish reviewVisible surface, edge treatment and cleanability checked for the application
PackingUnit protection and shipment method confirmed for the order

Applications

Use the application as the starting point, then adapt the structure to the actual facility.

01

New projects

Develop a specification from a room plan, equipment schedule or buyer drawing.

02

Replacement work

Match the critical opening size and operating requirements of an existing installation.

03

OEM repeat supply

Retain the approved model details for repeat orders and controlled revisions.

Can doors, shelves and accessories be customised?

Door opening direction, shelf layout, handles, feet or castors can be reviewed against your drawing and intended use. Final details are confirmed in the approved specification.

Can we approve details before production?

Yes. Dimensions and configuration are confirmed as part of the quotation and drawing or specification review.

Do you claim a fixed product standard for every custom item?

No. The applicable requirements depend on the product, destination and intended use, so buyers should state any mandatory project or regulatory requirement.

How are design changes handled?

Changes should be recorded before production approval. Later changes are reviewed for cost, material and schedule impact.

PROJECT FEASIBILITY REVIEW

Send your dimensions or drawing

Send the intended use, known dimensions and quantity. Add a drawing or reference photo by email if you have one.

Request a project review →