Component coverage
State whether the same material requirement applies to the benchtop, body, shelves, drawers, back and internal components.
COMMERCIAL CABINET RFQ CHECKLIST
Use this checklist to define the application, size, configuration, interfaces, quantity, packing and quotation scope. A clear RFQ reduces assumptions; it does not replace the approved drawing or local project review.
Do not guess material, thickness, sink openings or installation details. State what is known, mark unknown items as pending and identify which drawing or cabinet schedule is current. Tianze can then return specific questions and a quotation tied to a written scope.
Use one row per cabinet or clearly label repeated configurations.
COPYABLE EMAIL BRIEF
Replace the bracketed prompts with known information. Leave “TBC” where the project team still needs to decide.
Project / company: [name] Application: [room and intended use] Cabinet type: [base / wall / tall / drawer / sink / other] Overall size: [W × D × H in mm] Configuration: [doors, drawers, shelves, legs/castors/plinth] Material and finish: [requirement or TBC] Interfaces: [sink, waste, tap, plumbing, electrical, adjacent equipment] Quantity: [units by item] Destination: [city, state, country] Packing request: [if known] Requested Incoterm: [if known] Drawing / reference attached: [yes / no] Items still TBC: [list]
Missing information can change construction, price, packing or responsibility.
State whether the same material requirement applies to the benchtop, body, shelves, drawers, back and internal components.
Identify who supplies taps, wastes, traps, valves, power points and local connection work.
Record doorway, lift, stair, wall, floor and installation-access restrictions that affect unit or package size.
Keep freight, duty, tax, destination handling and local installation separate unless expressly included.
They are enough for a preliminary scope review. The final quotation must identify the dimensions, drawing revision and unresolved items that govern production.
Mark each unknown item as to be confirmed and state who will confirm it. Do not leave sink, waste, tap, electrical or adjacent-equipment boundaries implicit.
The approved drawing, written specification and accepted quotation together define the order scope. Any conflict or later change should be resolved in writing before production.
Only request the Incoterm and cost scope you need. Freight, duty, tax, destination handling and local installation should remain separate unless the quotation expressly includes them.
No. The checklist helps define the product and quotation. The buyer and local project team remain responsible for identifying applicable food, plumbing, building and installation requirements.
These sources frame buyer-side specification questions. They do not state that a Tianze product is certified or compliant; final requirements are confirmed for each order.
SEND THE RFQ
Email drawings and photographs separately, or start with the project enquiry form and identify what is still to be confirmed.
Request a project review →