Is every item tied to a drawing revision?
Use one item number across the schedule, drawing, quotation, packing list and site handover.
FITOUT PROCUREMENT CHECKLIST
Use one item schedule to connect site dimensions, cabinet configuration, service interfaces, approval status, packing and commercial scope. The aim is to prevent a low headline price from becoming an unclear handover.
A fitout contractor needs more than a product image. The purchasing file should show which revision governs, who confirms local requirements, what the supplier includes, what the importer and installer retain, and how variations are approved. Tianze coordinates production and export supply against the agreed drawing and quotation scope.
These authorised manufacturing-partner photographs show relevant construction and configuration details. They do not prove the material, thickness, certification or specification of a future order.
Cabinets, shelving, worktables and sink units should use consistent item numbers and quantities.
Taps, wastes, plumbing connections, equipment cut-outs and local installation must not remain implicit.
Use this table as a purchasing brief. Final values and inclusions are confirmed only in the approved drawing, written specification and accepted quotation.
These questions expose scope gaps that can change price, fabrication, packing or site responsibility.
Use one item number across the schedule, drawing, quotation, packing list and site handover.
The buyer, consultant, certifier, plumber or installer should confirm its applicable scope.
Freight, duty, tax, destination handling, unloading and installation should be listed rather than assumed.
Record the requested change, technical response, price or timing effect and approved revision.
Known information can be sent now. Mark unresolved items TBC instead of allowing the supplier to guess.
Yes. Send the item schedule, current drawings, quantity, destination and specification. Tianze will identify missing inputs and confirm which revision governs the quotation.
Local installation is not included unless expressly agreed in the written quotation. The fitout contractor should define unloading, positioning, fixing, sealing and service-connection responsibilities.
The buyer and its local consultant or licensed plumber should identify which supplied plumbing or drainage components fall within the applicable scope. The cabinet body alone does not decide this.
Buyer-appointed or third-party inspection can be discussed when scope, access, timing and cost are agreed before order confirmation. No inspection level is assumed.
Changes should be documented against the affected item and drawing revision, then reviewed for cost, material, packing and timing impact before approval.
These sources frame buyer-side specification questions. They do not state that a Tianze product is certified or compliant; final requirements are confirmed for each order.
PROJECT REVIEW
Tell us the application, known dimensions, quantity and destination. Email drawings or photographs separately if available.
Start a cabinet enquiry →